Shutting down the kitchen, the heart of your home, for a remodel can cast a chaotic shadow over your plans. You’ve been picturing it. Weeks of dust, days full of noise. Dinners huddled over takeout as the family tries to function through their disrupted routine. The idea can be enough to temporarily derail your enthusiasm for the project.

The right remodeling partner can keep your vision alive. The shadow of chaos is temporary, your kitchen remodel will last through the decades and if you depend on Ispiri, you’ll know the timeline given during the planning process is an accurate one.

The Honest Answer, Start-to-Finish

Your kitchen remodel schedule depends on the scope of your project. Kitchen renovations that focus on surface changes are going to have shorter timelines than those which include layout changes.

While talking to your remodel team is essential to getting a realistic timeline estimate, generally, a kitchen remodel from start-to-finish typically takes three to six months, depending on the project specifics. As this timeline includes the planning and ordering process, the actual demolition and construction of your kitchen, the part that interrupts your home life, will be much shorter.

The Phases of a Kitchen Remodel, in Order

When people think about kitchen renovations, they picture the action: the demo, rolling in new appliances, mounting the cabinetry. But before any of that happens, the most important step has to occur: the planning.

During the planning phase, you’ll work with designers to communicate your vision and understand your kitchen’s potential, coming up with a kitchen design you love. We’ll take thorough measurements and design a blueprint that encapsulates all your needs. After you approve the layout and the plan, we’ll help you select finishing materials, personalizing your space to suit your aesthetics.

Once the materials are selected, we’ll start ordering supplies such as cabinetry and tiles. Cabinet lead time can take six to 12 weeks so it’s vital to make these decisions early in the process for them to be ready for installation during kitchen remodel construction. With this in mind, there is often a waiting period between planning and demo, so your kitchen can stay intact until all the materials your kitchen will need are ready.

After the plan is set in place and the custom features have been ordered, demolition starts. This process usually takes about a week, depending on your kitchen’s complexity and size, as well as the scale of your project. During this phase, we move carefully and efficiently, ensuring the elements remaining in your kitchen are well taken care of.

Once the original kitchen has been stripped it’s time to start construction. Building the room can  take four to eight weeks, including cleanup. After completion, we’ll do a final walk-through, ensuring everything meets your expectations.

What Makes Timelines Slip, and How Design-Build Prevents It

When you hear about nightmare renovations, the stories often have similar beats. First the homeowner couldn’t get a hold of the contractor that was going to do the tilework, then the cabinets were delayed, pushing the project out at least a month, then the oven hood didn’t fit into the slot the drywall guys cut. In the end, the punchline is the same. A job that was supposed to take three months, took six and change, leaving the homeowners with a torn-up kitchen and no one to take responsibility.

When you work with Ispiri, our Design-Build services ensure that the stress of chasing down contractors will not happen to you. We’re all working together, on the same page, so that the vision we build matches the one you discussed in the planning process. Working closely together means we can meet any challenges as a team, making it simple to get the job done in the timeline we estimated from the beginning.

Living Through Your Remodel: Common Questions

The idea of living in a construction site can be a little daunting but with a planning, the time will go by quickly and you’ll have a beautiful kitchen, custom-built to suit your family when the dust is settled and swept up.

Can I Live in My House During a Kitchen Remodel?

Most families live at home throughout their kitchen remodel. While cooking in the work zone won’t be feasible, many homeowners set up temporary kitchens in another space so they can cook meals at home while their kitchen is in the works.

How Do I Set Up a Temporary Kitchen?

Moving your refrigerator to another location in your home, such as your dining room, is a great start to setting up your temporary kitchen. Secondly, choose your favorite countertop cooking appliances. Microwaves, toaster ovens, air fryers and crockpots are among the most popular choices to have on hand.

Finally, get organized. Put your most-used items in an easily accessible bin next to your appliances. Keep your favorite coffee cups, a knife and cutting board, a can opener, silverware essentials and serving utensils in the bin for easy, everyday use.

What Is the Best Time of Year to Start a Kitchen Renovation in Minnesota?

In Minnesota, winter is the time to plan, spring is the time to take action. The best kitchen remodel timeline is one that’s ready to begin as soon as construction season starts. Planning to start in the spring ensures your project gets done before the late summer so you can be moved in and comfortable by the time the holiday season rolls around.

A Clear Timeline Starts With a Clear Plan

The longest timelines come from poor planning. Plans that change halfway through execution, plans that aren’t solid at the beginning. Working with Ispiri ensures your kitchen renovation starts off on solid footing and stays within Ispiri’s estimated timeline.

The sooner you start, the sooner your kitchen renovation will be complete. Contact Ispiri to begin planning your project today.